Cutoffs for Dams

1st Edition

CIGB ICOLD

CRC Press
December 5, 2018 Forthcoming
Reference - 288 Pages
ISBN 9781138490086 - CAT# K349891
Series: ICOLD Bulletins Series

For Instructors Request Inspection Copy

was $107.00

USD$85.60

SAVE ~$21.40

Add to Wish List
FREE Standard Shipping!

Summary

ICOLD Bulletin 150, Cutoffs for Dams, discusses foundation treatment methods using cutoff-type barriers. High emphasis is given to alluvial deposits throughout this document; however, different materials may require cutoff. The construction of cutoffs has made significant advances mainly through the development of more powerful machinery for drilling and excavation, but also through the introduction of new concepts and techniques, such as jet grouting and deep soil mixing. The following types of cutoffs are presented in this Bulletin:

- Diaphragm walls
- Vib walls
- Pile walls
- Superimposed concreted galleries
- Jet grouting
- Deep mixing

These methods are described, and the practical application of each method is illustrated by selected case histories. These case histories also demonstrate how certain difficulties specific to a particular dam site have been dealt with. The performance of cutoffs should be monitored so that their efficiency in reducing flow and piezometric head can be evaluated. Piezometers installed in the foundation upstream and downstream of the cutoff are needed to meet this objective.

Instructors

We provide complimentary e-inspection copies of primary textbooks to instructors considering our books for course adoption.

Request an
e-inspection copy

Share this Title