Critical Path Analysis in Practice: Collected papers on project control

1st Edition

Gail Thornley

Routledge
Published May 7, 2013
Reference - 166 Pages
ISBN 9780415852975 - CAT# Y151428

For Instructors Request Inspection Copy

USD$59.95

Currently out of stock
Add to Wish List
FREE Standard Shipping!

Summary

Tavistock Press was established as a co-operative venture between the Tavistock Institute and Routledge & Kegan Paul (RKP) in the 1950s to produce a series of major contributions across the social sciences.
This volume is part of a 2001 reissue of a selection of those important works which have since gone out of print, or are difficult to locate. Published by Routledge, 112 volumes in total are being brought together under the name The International Behavioural and Social Sciences Library: Classics from the Tavistock Press.
Reproduced here in facsimile, this volume was originally published in 1968 and is available individually. The collection is also available in a number of themed mini-sets of between 5 and 13 volumes, or as a complete collection.

Instructors

We provide complimentary e-inspection copies of primary textbooks to instructors considering our books for course adoption.

Request an
e-inspection copy

Share this Title